• DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Teilen

Folgen

Cálculo y control detallado del proceso de construcción del tramo atirantado del Puente de la Constitución de 1812 sobre la Bahía de Cádiz

Autor(en):

Medium: Fachartikel
Sprache(n): en  es 
Veröffentlicht in: Hormigón y acero, , n. 278-279, v. 67
Seite(n): 111-122
DOI: 10.1016/j.hya.2016.03.006
Abstrakt:

Detailed analysis and control of the construction process of the Constitución de 1812 Bridge over the Cadiz Bay

The erection of the bridge with an almost symmetrical balanced cantilever, with a maximum length of 218.5m, with no additional supports apart from the tower itself, and the erection of the truly massive segment of about 20.0m long, 34.30m wide, and up to 4,000kN in weight, establishing the construction sequence when part of the towers were already erected, have made the calculation and control of the construction a significant challenge.It has required a detailed analysis of the 1275 construction stages using non-linear geometric and material calculations, checking all the cable stays, tower and deck elements, including accidental actions, such as fallen segments, exhaustively controlling all loads on the deck and changes in the construction sequence.

Bauwerke und Projekte

Anzeige

  • Über diese
    Datenseite
  • Reference-ID
    10075454
  • Erstellt am
    27.03.2018
  • Geändert am
    07.10.2018