• DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Teilen

Folgen

Control operativo frente a los efectos del viento en la construcción del Puente de la Constitución de 1812 sobre la Bahía de Cádiz

Autor(en):

Medium: Fachartikel
Sprache(n): en  es 
Veröffentlicht in: Hormigón y acero, , n. 278-279, v. 67
Seite(n): 255-260
DOI: 10.1016/j.hya.2016.04.002
Abstrakt:

Operational wind clima control for the construction of the Constitución de 1812 Bridge over the Cadiz Bay

Wind effects determine serviceability, ultimate as well as operational states in certain bridge structures such as the present. A high resolution wind clima model is often necessary in the assessment of these states. Design wind speeds probabilistic models and construction control can be both optimized by means of these models. Required model calibration and control requires specific wind monitoring at a sufficiently high spatial and time resolution. This article presents the system that was implemented for the Constitución de 1812 Bridge over the Cadiz Bay.

Bauwerke und Projekte

Anzeige

  • Über diese
    Datenseite
  • Reference-ID
    10075467
  • Erstellt am
    27.03.2018
  • Geändert am
    07.10.2018