• DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Teilen

Folgen

Empuje del viaducto de acceso del Puente de la Constitución de 1812 sobre la Bahía de Cádiz

Autor(en):

Medium: Fachartikel
Sprache(n): en  es 
Veröffentlicht in: Hormigón y acero, , n. 278-279, v. 67
Seite(n): 199-208
DOI: 10.1016/j.hya.2015.12.007
Abstrakt:

Launching access viaduct of the Constitución de 1812 Bridge over the Cadiz Bay

The deck of the access viaduct from Cádiz of Constitución de 1812 cable-stayed Bridge, with a length of 581,3m and an average width of 33,20m, is a structure of double composite action. The construction process used is the launching of the deck from one side with the aid of a temporary active stay system to save the standard span length of 75m (maximum). The steel section of the deck is pushed with the floor slabs stockpiled on it and a central street of 6m width of the upper slab concreted representing a total weight of 81.000kN.This article describes the main features of the structure of the deck, along with the maneuvers and most significant launching auxiliary elements.

Bauwerke und Projekte

Anzeige

  • Über diese
    Datenseite
  • Reference-ID
    10075462
  • Erstellt am
    27.03.2018
  • Geändert am
    07.10.2018