• DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Teilen

Folgen

Modelización estructural avanzada en el proyecto y construcción del tramo atirantado del Puente de la Constitución de 1812 sobre la Bahía de Cádiz

Autor(en):


Medium: Fachartikel
Sprache(n): en  es 
Veröffentlicht in: Hormigón y acero, , n. 278-279, v. 67
Seite(n): 159-172
DOI: 10.1016/j.hya.2016.02.005
Abstrakt:

Advanced structural modelling for the design and construction of the Constitución de 1812 cable-stayed Bridge over the Cadiz Bay

At the design stage of the cable-stayed bridge, and more so during the construction process, it was necessary to develop a series of specific analyses to take into account the three-dimensional configuration of the structure. Although initially every element was designed according to lineal elastic regimen, during construction, geometric non-linearity was considered to minimize reinforcements due to the increase of loads, and material non-linearity to assess already built elements, considering local yielding at ultimate limit state.Additionally, several analyses were carried out to optimize the construction cycle and to calibrate geometric control models.Finally, two dynamic studies have been included, aerolastic stability of the stays and coupling oscillations phenomenon occurred during the lifting of a segment from a barge.

Bauwerke und Projekte

Anzeige

  • Über diese
    Datenseite
  • Reference-ID
    10075457
  • Erstellt am
    27.03.2018
  • Geändert am
    07.10.2018