• DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Teilen

Folgen

Tramo desmontable del Puente de la Constitución de 1812 sobre la Bahía de Cádiz

Autor(en):


Medium: Fachartikel
Sprache(n): en  es 
Veröffentlicht in: Hormigón y acero, , n. 278-279, v. 67
Seite(n): 209-219
DOI: 10.1016/j.hya.2016.03.007
Abstrakt:

Removable deck of the Constitución de 1812 Bridge over the Cadiz Bay

A simply supported 150m long deck was built on the Cadiz Bay Bridge on the part that runs over the sea. It weighs about 4,000t, and has the possibility of being removed to make a way through the bridge, and allow the navigation of large floating structures that exceed the vertical clearance of 69.00m, which is what is available in the main navigation channel in the centre of the main span. This article describes the removable span and the special operations carried out for its installation. Within the complexity of these manoeuvres, the following can be highlighted: the transfer of the bridge deck from the dock to the floating barge, the positioning of the deck between piers, and the lifting operation to their final supports on the piers head.

Bauwerke und Projekte

Anzeige

  • Über diese
    Datenseite
  • Reference-ID
    10075463
  • Erstellt am
    27.03.2018
  • Geändert am
    07.10.2018