0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Improvement of Dry Air Injection System for main cables of Seto- Ohashi Bridges

 Improvement of Dry Air Injection System for main cables of Seto- Ohashi Bridges
Autor(en): , , ,
Beitrag für IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015, veröffentlicht in , S. 1400-1407
DOI: 10.2749/222137815818358745
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.15 MB

A “Dry Air Injection System for main cables (DAIS)” was developed by the Honshu-Shikoku Bridge Expressway Co., Ltd. (HSBE), in order to keep in sound condition of the main cables over the long term...
Weiterlesen

Bibliografische Angaben

Autor(en): (Honshu-Shikoku Bridge Expressway Co., Ltd., Kobe, JAPAN)
(Honshu-Shikoku Bridge Expressway Co., Ltd., Kobe, JAPAN)
(Honshu-Shikoku Bridge Expressway Co., Ltd., Kobe, JAPAN)
(Honshu-Shikoku Bridge Expressway Co., Ltd., Kobe, JAPAN)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015
Veröffentlicht in:
Seite(n): 1400-1407 Anzahl der Seiten (im PDF): 8
Seite(n): 1400-1407
Anzahl der Seiten (im PDF): 8
Jahr: 2015
DOI: 10.2749/222137815818358745
Abstrakt:

A “Dry Air Injection System for main cables (DAIS)” was developed by the Honshu-Shikoku Bridge Expressway Co., Ltd. (HSBE), in order to keep in sound condition of the main cables over the long term. And the DAIS was installed to the Akashi-Kaikyo Bridge as the first case in the world. In parallel with installation of the DAIS in new bridges, the HSBE also installed the DAIS in all the existing HSBE’s suspension bridges, in which progressive corrosion of the cable wires was observed. After approximately ten years of the DAIS installation, the monitoring data in the Seto- Ohashi Bridges showed that Relative Humidity (RH) of inside the cables still remained high in some portions. Through a trial and error process, we made improvements of the DAIS, which mainly composed of alteration of injection points, in order to keep RH of the entire length of the cables less than a target value (40%RH). This paper describes improvements of the DAIS and its results.

Stichwörter:
Hängebrücke Tragkabel Monitoring

Bauwerke und Projekte