0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Single span strengthening of a Listed masonry arch railway viaduct

 Single span strengthening of a Listed masonry arch railway viaduct
Autor(en): ,
Beitrag für IABSE Conference: Creativity and Collaboration – Instilling Imagination and Innovation in Structural Design, Bath, United Kingdom, 19-20 April 2017, veröffentlicht in , S. 348-355
DOI: 10.2749/222137817821233125
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.17 MB

Due for completion in December 2017, the Ordsall Chord connects Manchester’s Piccadilly and Victoria railway stations for the first time, improving rail connectivity, reducing rail service congesti...
Weiterlesen

Bibliografische Angaben

Autor(en):

Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Conference: Creativity and Collaboration – Instilling Imagination and Innovation in Structural Design, Bath, United Kingdom, 19-20 April 2017
Veröffentlicht in:
Seite(n): 348-355 Anzahl der Seiten (im PDF): 8
Seite(n): 348-355
Anzahl der Seiten (im PDF): 8
Jahr: 2017
DOI: 10.2749/222137817821233125
Abstrakt:

Due for completion in December 2017, the Ordsall Chord connects Manchester’s Piccadilly and Victoria railway stations for the first time, improving rail connectivity, reducing rail service congestion, allowing new railway services to be introduced, and creating over £1bn of economic benefit.

The Chord comprises a new elevated viaduct, with substantial alterations and widening to existing brick railway viaducts. The Castlefield viaduct is an existing Grade II listed 1845 masonry arch viaduct affected by the widening of the Chord. The longest span, COL120A, was in very poor condition and required strengthening to accommodate the new railway arrangement without any long- term maintenance liability.

The design was developed in a strongly collaborative approach, whose benefits are discussed throughout the narrative, to successfully deliver this challenging structure in time for the 2016 Christmas blockade, a heavily constrained period due to other simultaneous major works to be carried out to the Chord.

Stichwörter:
Eisenbahnbrücke Verstärkung

Bauwerke und Projekte