0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

To The Question of Risk Management for Failures of Cable-Stayed and Prestressed Bridges in Russia

 To The Question of Risk Management for Failures of Cable-Stayed and Prestressed Bridges in Russia
Autor(en):
Beitrag für IABSE Workshop: Safety, Failures and Robustness of Large Structures, Helsinki, Finland, 14-15 February 2013, veröffentlicht in , S. 292-295
DOI: 10.2749/222137813807018836
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.58 MB

The characteristic cases of cable-stayed and prestressed bridge structures failures and collapses in Russia are considered. Some results of risk analysis methodology applied to bridge structures ar...
Weiterlesen

Bibliografische Angaben

Autor(en):
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Workshop: Safety, Failures and Robustness of Large Structures, Helsinki, Finland, 14-15 February 2013
Veröffentlicht in:
Seite(n): 292-295 Anzahl der Seiten (im PDF): 4
Seite(n): 292-295
Anzahl der Seiten (im PDF): 4
Jahr: 2013
DOI: 10.2749/222137813807018836
Abstrakt:

The characteristic cases of cable-stayed and prestressed bridge structures failures and collapses in Russia are considered. Some results of risk analysis methodology applied to bridge structures are given. The process of identification of potential hazards and possible failure modes, definition the critical risk of failure with respect to the bridge structures are described. In order to improve a technical condition of bridge structures and to reduce the risks of their failures and collapses, some risk management actions were suggested with respect to the cable-stayed bridge on the Russian island in Vladivostok. Some of them are given in the report. For example, an inspection monitoring system, founded on new non-destructive equipment, is developed.

Stichwörter:
Risikomanagement Versagen Lebenszyklus Einstürze