0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Cost Efficiency in Design - Hyderabad Metro Rail

 Cost Efficiency in Design - Hyderabad Metro Rail
Autor(en): , , ,
Beitrag für IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, veröffentlicht in , S. 589-597
DOI: 10.2749/stockholm.2016.0568
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.18 MB

Hyderabad Metro comprises of three high density corridors covering a distance of 72 km with ultra-modern station buildings. To tap the benefits of scale, Standardization of all component of structu...
Weiterlesen

Bibliografische Angaben

Autor(en): (Larsen & Toubro Limited, Mumbai, India)
(Larsen & Toubro Limited, Mumbai, India)
(Larsen & Toubro Limited, Mumbai, India)
(Larsen & Toubro Limited, Mumbai, India)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016
Veröffentlicht in:
Seite(n): 589-597 Anzahl der Seiten (im PDF): 9
Seite(n): 589-597
Anzahl der Seiten (im PDF): 9
Jahr: 2016
DOI: 10.2749/stockholm.2016.0568
Abstrakt:

Hyderabad Metro comprises of three high density corridors covering a distance of 72 km with ultra-modern station buildings. To tap the benefits of scale, Standardization of all component of structure was essential. Precast segmental construction was adopted with standard spans varying from 37m to 19m. 31m span was found to be optimum after careful analysis on the influence of variables such as alignment, geotechnical strata, construction and service loads and design requirement. To optimize the substructure designs, realistic modelling and analysis such as Rail Structure Interaction and P-Delta analysis was performed. Controlled Low Strength Material was used as a filler to reduce the founding depth for increased workmen safety. Portals were converted to precast for the ease of construction. Stations were designed as precast segmental Spine and wing structure at concourse level and box girder at platform level to enable faster construction and zero obstruction to traffic.

Stichwörter:
Hohlkasten

Bauwerke und Projekte