0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Study on the Continuous Prestressed Concrete Beam Bridge Risk Assessment in Construction Phase

 Study on the Continuous Prestressed Concrete Beam Bridge Risk Assessment in Construction Phase
Autor(en): , ,
Beitrag für IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, veröffentlicht in , S. 2138-2146
DOI: 10.2749/stockholm.2016.2146
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.19 MB

The risk assessment has been studied for bridge Construction, in order to reduce the occurrence probability of the accident and ensure the personnel and structural safety. The hierarchical decompos...
Weiterlesen

Bibliografische Angaben

Autor(en): (School of Civil Engineering, Beijing Jiao tong University, Beijing 100044,China)
(China Academy of Transportation Sciences, Beijing 100029, China)
(School of Civil Engineering, Beijing Jiao tong University, Beijing 100044, China)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016
Veröffentlicht in:
Seite(n): 2138-2146 Anzahl der Seiten (im PDF): 9
Seite(n): 2138-2146
Anzahl der Seiten (im PDF): 9
Jahr: 2016
DOI: 10.2749/stockholm.2016.2146
Abstrakt:

The risk assessment has been studied for bridge Construction, in order to reduce the occurrence probability of the accident and ensure the personnel and structural safety. The hierarchical decomposes method has been used in the project to decompose the construction phase of each part and to identify the basic risk sources; by the way of letter inquiry to consult experts for analysing and estimating the risk; according to risk probability and risk level assignment to determine risk value; the risk list has been ultimately formed. We must consider the acceptable level of risk; the decision-makers can make optimal decisions using the theoretical achievement. The risk assessment used in the continuous prestressed concrete beam bridge construction phase has given good results and gained high appraisal.

Stichwörter:
Risikobewertung