• de
  • en
  • fr
  • Internationale Datenbank für Ingenieurbauwerke

Teilen

Folgen

Spenden

Matthias Schüller

Bibliografie

  1. Schüller, Matthias (2009): Deh Cho Bridge im Norden Kanadas. In: Brückenbau, v. 1, n. 4-1 ( 2009- 2010), S. 77.
  2. Schüller, Matthias / Singh, Prabhjeet Raj (2010): Fast mover. Effective use of software has been central to a redesign which took just five months. In: Bridge Design & Engineering, v. 16, n. 58 (1. Quartal 2010), S. 52.
  3. Schüller, Matthias / Singh, Prabhjeet Raj (2010): Remote control. A major bridge crossing in Canada's remote Northwest Territories is set to move ahead again after being halted for an extensive and rapid redesign. In: Bridge Design & Engineering, v. 16, n. 58 (1. Quartal 2010), S. 30-31.
  4. Homsi, Elie / Schüller, Matthias / Singh, Prabhjeet Raj (2009): Doubling up. Changes to the planned launch scheme for a 30m-wide bridge deck in Canada led to cost and time savings. In: Bridge Design & Engineering, v. 15, n. 57 (4. Quartal 2009), S. 46.
  5. Koehler, Christian / Kulhavy, Tomas / Schüller, Matthias / Singh, Prabhjeet Raj (2009): Golden challenge. In: Bridge Design & Engineering, v. 15, n. 56 (3. Quartal 2009), S. 28, 30-31.
Weitere Veröffentlichungen...
  • Über diese
    Datenseite
  • Person-ID
    1003092
  • Erstellt am
    04.12.2003
  • Geändert am
    22.07.2014