0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

An implementation of expected utility theory in a civil engineering decision problem

An implementation of expected utility theory in a civil engineering decision problem
Autor(en): , ,
Beitrag für IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015, veröffentlicht in , S. 953-960
DOI: 10.2749/222137815818358178
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.08 MB

Decisions concerning bridge management often rely on experience, engineering judgement and heuristics. In this contribution, with the aid of a real-life case study, we show how a bridge management ...
Weiterlesen

Bibliografische Angaben

Autor(en): (University of Trento, Trento, Italy)
(University of Trento, Trento, Italy)
(University of Trento, Trento, Italy)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015
Veröffentlicht in:
Seite(n): 953-960 Anzahl der Seiten (im PDF): 8
Seite(n): 953-960
Anzahl der Seiten (im PDF): 8
Jahr: 2015
DOI: 10.2749/222137815818358178
Abstrakt:

Decisions concerning bridge management often rely on experience, engineering judgement and heuristics. In this contribution, with the aid of a real-life case study, we show how a bridge management strategy can be optimized scientifically by applying expected utility theory, a framework already used in econometrics and medicine in order to identify optimal actions in agreement with a risk profile. We show how the engineering decision problem is modelled and how expected utility theory is implemented in order to obtain a set of decision rules that enables the decision maker to identify the optimal action based on structural reliability and costs. The results show that the implementation of expected utility theory in ordinary civil engineering problems is feasible and provides results based on the the risk profile taken into account during the calibration of the model.

Stichwörter:
Tragwerkszuverlässigkeit