0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Using measurement to reduce model uncertainty for better predictions

 Using measurement to reduce model uncertainty for better predictions
Autor(en): ,
Beitrag für IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015, veröffentlicht in , S. 1255-1262
DOI: 10.2749/222137815818358538
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.08 MB

Accurate models of real behaviour that are determined through measurements help engineers avoid expensive interventions and structural replacement. Model calibration by “curve-fitting” measurements...
Weiterlesen

Bibliografische Angaben

Autor(en): (Applied Computing and Mechanics Laboratory, School of Architecture, Civil and Environmental Engineering (ENAC), Swiss Federal Institute of Technology (EPFL) Lausanne, Switzerland)
(Applied Computing and Mechanics Laboratory, School of Architecture, Civil and Environmental Engineering (ENAC), Swiss Federal Institute of Technology (EPFL) Lausanne, Switzerland)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015
Veröffentlicht in:
Seite(n): 1255-1262 Anzahl der Seiten (im PDF): 8
Seite(n): 1255-1262
Anzahl der Seiten (im PDF): 8
Jahr: 2015
DOI: 10.2749/222137815818358538
Abstrakt:

Accurate models of real behaviour that are determined through measurements help engineers avoid expensive interventions and structural replacement. Model calibration by “curve-fitting” measurements to predictions is not appropriate for full-scale structures. This paper compares two population methods that can include modelling and measurement uncertainties using a simple example of a one-span beam. Standard applications of Bayesian inference that involve assumptions of independent zero-mean Gaussian distributions may not lead to accurate predictions, particularly when extrapolating. Another method, error-domain model falsification provides more reliable, albeit more approximate, predictions – especially when prediction is extrapolation. An example of a full-scale bridge illustrates the usefulness of the methodology in a real situation through improvements to fatigue-life estimates compared with design-type calculations without measurements.

Stichwörter:
Extrapolation