Change Orders and Schedule Performance of Design-Build Infrastructure Projects: Comparison between Highway and Water and Wastewater Projects

Autor(en): ORCID (Ph.D. Student, Dept. of Civil and Environmental Engineering and Construction, Howard R. Hughes College of Engineering, Univ. of Nevada, Las Vegas, NV 89154 (corresponding author))
ORCID (Professor, Dept. of Civil and Environmental Engineering and Construction, Howard R. Hughes College of Engineering, Univ. of Nevada, Las Vegas, NV 89154)
(Formerly, Graduate Student, Dept. of Civil and Environmental Engineering and Construction, Howard R. Hughes College of Engineering, Univ. of Nevada, Las Vegas, NV 89154.)
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 1, v. 12
Seite(n): 04519043
DOI: 10.1061/(asce)la.1943-4170.0000353
Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1061/(asce)la.1943-4170.0000353.
  • Über diese
    Datenseite
  • Reference-ID
    10579994
  • Veröffentlicht am:
    08.03.2021
  • Geändert am:
    08.03.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine