0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Delay Analysis Methodologies Used by Engineering and Construction Firms in Egypt

Autor(en): (Contracts and Procurement Manager, Sixth of October Development and Investment Company, Km. 38 Cairo-Alexandria Desert Rd., Sheikh Zayed City, P.O. Box 119, Sheikh Zayed, Cairo 12593, Egypt; formerly, M.Sc. Student, Dept. of Structural Engineering, Facult)
(Senior Lecturer, School of Property, Construction and Project Management, RMIT Univ., G.P.O. Box 2476, Melbourne, VIC 3001, Australia; Associate Professor, Dept. of Structural Engineering, Faculty of Engineering, Cairo Univ., Giza 12613, Egypt (correspond)
(Professor, Dept. of Structural Engineering, Faculty of Engineering, Cairo Univ., Giza 12613, Egypt.)
(Professor, Dept. of Structural Engineering, Faculty of Engineering, Cairo Univ., Giza 12613, Egypt.)
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 3, v. 11
Seite(n): 04519006
DOI: 10.1061/(asce)la.1943-4170.0000293
Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1061/(asce)la.1943-4170.0000293.
  • Über diese
    Datenseite
  • Reference-ID
    10579941
  • Veröffentlicht am:
    08.03.2021
  • Geändert am:
    08.03.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine