0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Improving materials logistics plan in road construction projects using discrete event simulation

Autor(en):



Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Engineering, Construction and Architectural Management, , n. 10, v. 28
Seite(n): 3144-3163
DOI: 10.1108/ecam-08-2018-0317
Abstrakt:

Purpose

Motivated by the high cost of material movements in road construction projects, past studies have used analytical methods to optimize materials logistics plans. A key shortcoming of these methods is their inability to capture the uncertain, dynamic and complex characteristics of the road construction material logistics. Failure to incorporate these characteristics can lead to sub-optimal results. The purpose of this study is to propose the use of discrete event simulation (DES) to address the existing shortfall.

Design/methodology/approach

Despite the powerful capabilities of DES models in capturing the operational complexities of construction projects, they have not been previously utilized to optimize the material logistics of road construction projects. The proposed DES-based method in this research captures the operational details of material logistics and uses a heuristic approach to overcome the combinatorial problem of numerous choices. The method was applied to a 63.5 km real-world road construction project case to demonstrate its capabilities.

Findings

Six different material types from 28 material sources were used in the case. Approximately 1.5% of the material logistics costs were saved by following the proposed method and choosing appropriate material sources.

Originality/value

This research contributes to the body of knowledge by leveraging the capabilities of DES and presenting a novel method for improving the materials logistics plan of road construction projects. The proposed method provides practitioners with the basis for capturing the key operational details that were overlooked in the past. The proposed method can be adopted in road construction projects to reduce the overall material procurement cost.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1108/ecam-08-2018-0317.
  • Über diese
    Datenseite
  • Reference-ID
    10577110
  • Veröffentlicht am:
    26.02.2021
  • Geändert am:
    29.11.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine