0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

A Life-cycle Analysis Approach applied to the Strengthening of the Jarama Steel Bridge

A Life-cycle Analysis Approach applied to the Strengthening of the Jarama Steel Bridge
Autor(en): , ,
Beitrag für IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018, veröffentlicht in , S. S14-1
DOI: 10.2749/nantes.2018.s14-1
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.37 MB

This paper presents some results obtained in the Infravation research project called “Fast and effective solution for steel bridges life-time extension” (FASSTbridge). The aim of this project is to...
Weiterlesen

Bibliografische Angaben

Autor(en): (University Paris-Est, IFSTTAR, Materials and Structures department, Champs-sur-Marne, France)
(Université Paris-Est, Laboratoire Navier (UMR 8205), Marne-la-Vallée, France)
(IFSTTAR, MAST department, SMC Laboratory, Allée des Ponts et Chaussées, Bouguenais, France)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018
Veröffentlicht in:
Seite(n): S14-1 Anzahl der Seiten (im PDF): 9
Seite(n): S14-1
Anzahl der Seiten (im PDF): 9
DOI: 10.2749/nantes.2018.s14-1
Abstrakt:

This paper presents some results obtained in the Infravation research project called “Fast and effective solution for steel bridges life-time extension” (FASSTbridge). The aim of this project is to develop and demonstrate a reliable, preventive, cost-effective and sustainable solution for steel bridges fatigue life-time extension. As a demonstration example, the Jarama Bridge was selected in this project. The Jarama bridge is located in the outskirts of the city of Madrid, over the river Jarama on road M-111, and has a total length of 115,5m and 5 spans (max span length 33,5m). Erected in the 1960s, it has suffered since then a considerable increase of traffic flow which was not considered at its design stage. This paper leads a cost-benefit analysis and a life cycle analysis of the CFRP solution compared with traditional techniques (use of steel plates) and considering the economic and environmental profit of the preventing policy. The aim is to adopt a preventive strategy to allow road administrations enlarging the service life of steel and composite steel bridges in a cost-effective and sustainable manner.

Stichwörter:
Brücken Ermüdung