SHM of the new bridge over the River Sado in Portugal during construction

 SHM of the new bridge over the River Sado in Portugal during construction
Autor(en): , ,
Beitrag für IABSE Symposium: Long Span Bridges and Roofs - Development, Design and Implementation, Kolkata, India, 24-27 September 2013, veröffentlicht in , S. 1-8
DOI: 10.2749/222137813808627118
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.27 MB

The new railway crossing over the River Sado is a 2,7 km long bridge, including two approach viaducts and a main bridge. The main bridge, with a continuous deck over 480 m, consists of three contin...
Weiterlesen

Bibliografische Angaben

Autor(en):


Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Long Span Bridges and Roofs - Development, Design and Implementation, Kolkata, India, 24-27 September 2013
Veröffentlicht in:
Seite(n): 1-8 Anzahl der Seiten (im PDF): 8
Seite(n): 1-8
Anzahl der Seiten (im PDF): 8
Jahr: 2013
DOI: 10.2749/222137813808627118
Abstrakt:

The new railway crossing over the River Sado is a 2,7 km long bridge, including two approach viaducts and a main bridge. The main bridge, with a continuous deck over 480 m, consists of three continuous bowstrings with a single plane of hangers on the bridge axis. The bridge is located in an environmentally sensitive area which conditioned the design and the construction methods used.

The bridge importance, its structural complexity and the innovative constructions methods used were the main constraints and motivations for the development of the implemented structural monitoring system, which is described herein. The motivation of this paper is to present the structural monitoring system and the experimental bridge behaviour during the deck incremental launching and the hoisting of the arches.

Stichwörter:
Taktschiebeverfahren