0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Temburong Bridge, Brunei - Design of two cable stayed bridges

 Temburong Bridge, Brunei - Design of two cable stayed bridges
Autor(en): , , , ,
Beitrag für IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014, veröffentlicht in , S. 1979-1986
DOI: 10.2749/222137814814068445
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.21 MB

The Temburong Bridge Project is a 30km long dual two-lane highway crossing over the Brunei Bay. It will connect the relatively isolated Brunei district of Temburong to the other three Brunei distr...
Weiterlesen

Bibliografische Angaben

Autor(en):





Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014
Veröffentlicht in:
Seite(n): 1979-1986 Anzahl der Seiten (im PDF): 8
Seite(n): 1979-1986
Anzahl der Seiten (im PDF): 8
Jahr: 2014
DOI: 10.2749/222137814814068445
Abstrakt:

The Temburong Bridge Project is a 30km long dual two-lane highway crossing over the Brunei Bay. It will connect the relatively isolated Brunei district of Temburong to the other three Brunei districts. The main objective of the project is to stimulate economic growth in the Temburong region by connecting it to the country’s airport and ports. The alignment crosses two navigation channels resulting in the need for two cable stayed bridges – the Brunei Channel Bridge (145m main span) and the Eastern Channel Bridge (260m main span).

The design of these cable stayed bridges is one of the first applications of the Eurocode to a fully concrete cable stayed bridge. Both cable stayed bridges draw on strong Islamic architectural influences from the region to form a tower shape that is unique and instantly recognisable.

Stichwörter:
Meeresüberquerung

Bauwerke und Projekte

Bauwerkstypen